So it’s been a busy week at work, what with hosting a French Film Festival on top of everything else, and I haven’t had much time to devote to the house.
Today, though, I decided to finish the bathroom floor. First I cut out the floor pieces to fit the room correctly.
I made a hole in the back wall to fit the wires for the sconce that’s coming in the mail. And I glued in the back wall.
Next I cut a hole for the window between the toilet and the bathroom heating stove, and glued in the side wall.
Then I glued in the tiles…
…added the border…
…and took a rather fuzzy view from above of the bathroom and the linen closet (I still need to figure out how to set up the tripod above the house).
I may even come back and do more tonight, if I have time.
But for now…I need to walk the dog (the real one, not the miniature one)…